Menu

How Top Down Estimation in Primavera P6 works

In Primavera, there is a function called Top Down Estimation, which helps you calculate an estimated figure for Labor and Non-labor unit based on “estimation weights”. Top Down Estimation can be applied to both the WBS and Activity. I will show you how Top Down Estimation works in Primavera

Challenges of a Cost Estimator’s Job

If anyone asks, ‘What do you like the most about being a cost estimating professional?”,   An owner’s cost estimator might say ‘the cost estimator plays an important role in an owner’s budgeting efforts for different projects.’  A cost estimator working for a consulting firm might say ‘In addition to supporting an owner’s budgeting efforts, the cost estimator is able to provide cost

Project Controls Plan Components

Have you ever been assigned to a project and were asked to develop a project related procedure, report, or presentation, but didn’t know exactly how?   Wouldn’t it be easier if you were given the structure and elements of your project report or procedure?  Watch

What Kind of a Plan is a Project Controls Plan?

Have you ever been assigned to a project, where each member of a team had the same perspective of how Project Controls should be conducted in the project?  Have you ever experienced working in a project where there was a well-established Project Controls execution