Think closing power plants is less risky than opening them? That’s a … – Utility Dive
August 2, 2019
No Comments
Think closing power plants is less risky than opening them? That’s a … Utility Dive
How the Anticipated Cost Report Method Helps in Managing Construction Costs
June 25, 2019
No Comments
Changes are inevitable in construction and in any project. There might be costs that were not budgeted or authorized initially. A change due to differing site conditions, design errors or omissions, or a scope change due to owner’s added requirements may lead to change
DEEPWATER RISKS-1: Challenges, risks can be managed in deepwater oil and gas projects – Oil & Gas Journal
June 19, 2019
No Comments
DEEPWATER RISKS-1: Challenges, risks can be managed in deepwater oil and gas projects Oil & Gas Journal
(PDF) Critical success factor analysis for effective risk management at the execution stage of a construction project – ResearchGate
June 15, 2019
No Comments
(PDF) Critical success factor analysis for effective risk management at the execution stage of a construction project ResearchGate
Core Estimating for Owner Companies
May 21, 2019
No Comments
How can you increase core-estimating maturity for Owner companies and improve project performance and increased capital efficiency in today’s construction industry? Introduction Owners rely on cost estimates to perform an economic analysis of the return on their capital investments or capital expenditures (CAPEX). Estimates are critical to
Successfully Managing Construction Mega-Projects – Area Development
May 16, 2019
No Comments
Successfully Managing Construction Mega-Projects Area Development
The Ins and Outs of Working With an Architectura l/ Engineering Firm – Area Development
May 14, 2019
No Comments
The Ins and Outs of Working With an Architectura l/ Engineering Firm Area Development
Cost Control vs. Cost Management
May 5, 2019
No Comments
What is the difference between cost control and cost management? Cost management and cost control are two terms that often get mixed up. If you think about the words, what sounds better? Would you rather be in control or managing your costs? It turns out that cost management
How to Create a Great Project Plan in Just 7 Steps – Business 2 Community
April 16, 2019
No Comments
How to Create a Great Project Plan in Just 7 Steps Business 2 Community
The Top 20 Reasons Why Construction Projects Experience Cost Overrun
April 15, 2019
No Comments
Why do so many construction projects have cost overrun by as much as 10% to more than 100%? How can cost overrun be rectified? This continuing cost overrun situations costs industry million dollars each year and wastes valuable engineering /construction labor resources. Construction cost overruns are an everyday happening on mid-sized