What is Negative Float and How to Deal With It in Primavera P6?
We all have learned a lot about calculating Total Float and Critical Path in a network diagram and have seen zero total floats for critical activities or positive floats for non-critical ones. In real projects, we will encounter with negative floats in a schedule network diagram. Have you ever wondered what causes the negative floats